INFRASTRUCTURE
A PLAN DIRECTION

-
Review Sundastrait bridge seaport facility to activate Industrial & logistics functions.
-
Role of logistics network that links neighboring Metropolitan transport system.
-
Infrastructure for the export/import of raw materials and finished product.
-
Size will be determined according to the development demand of the neighboring areas
-
Possibility of adding passenger terminal function such as marina if conditions change.
B PLAN CRITERIA
-
Review quantity of goods transported and seaport site conditions.
-
Analyze the connectivity of industrial complexes, investment fund etc.
-
Determine the port function according to the characteristics of cargo.
-
Seaport Facility:
-
basic facility: harbour, breakwater, berthing facilities.
-
functional facility: waiting room, storage, open-air storage yard.
-
supporting facility: garage, work facility.
-

C CASE OF FACILITY ARRANGEMENT

Port Details
-
Effective length: ± 793,92 m
-
Shoreline total: ± 1,8 Km
-
Reclamation area: ± 15 Ha
-
Breakwater distance: ± 1,2 Km
Plan to built multi-purpose dock & container terminal for the sea traffic located near the industrial complex & neighbouring area.
D SEA PORT PLAN

Harbor are the key element of enhancing national competitiveness, it is necessary to invest considerable amounts of time and money into port industry including expansion of port facilities and modernization & automation of operation facilities.
E WATER SUPPLY FACILITIES PLAN

Planning and designing of dams and reservoirs for securing abundant water resources and developing new design methods for protecting flood damages. Create rehabilitated river spaces for relaxation and cultural life aiming at improving people’s quality of living by building city waterfronts, environment-friendly wetlands, and by managing water resources effectively.
ILLUSTRATIVE PHASE

Key Industry Base Complex
Major Facilities : Industrial facility, utility facility, parking lots, park, green belt, access road (include flyover).
Functional Placement : industrial supporting facilities such as utilities & parking lots are placed at the northern site of the complex and green network is situated centrally while steel industry at the outer area and non-steel industry at the inner area are situated along the green network.
Utility Plan : considering the demand of industrial complex, a self-regulating utility supporting facility will be placed at the northern site of the complex Traffic.
Line: : Improve the accessibility to POSCO Industrial complex and major cities by building a major accessroad that links the highways between “Tangerang” and “Merak”.

Seaport facility and logistics. Industry Supporting
Major Facilities : Industrial Facility(including port logistics facility).
Functional Placement : industrial facility with port facility are placed along the shoreline while steel & non-steel industries are placed at the port-hinterland.
Utilities Plan : supporting facility at the northern site of first and second stages is partially constructed In order to secure the utility supporting facility.
Traffic Line : utilize the pre-existing seaside road as an access road within the complex.

Industry & Tourism Complex
Major Facilities : Industrial facility, residential, commercial, business supporting facilities, parking lots, utilities, park, green belt, leisure sport facilities.
Functional Placement : residential, commercial, and business supporting facilities linked to the central green land are placed at the center of the complex while public & leisure sport facilities are placed separated from the industrial facility at the outer site of the complex.
Utility Plan: considering the additional demand in industry, additional utilities supporting facility is placed at the southern site of the complex.
Traffic Line: segregate major traffic lines of facilities outside of industry by building an access road in the form of at-grade intersection within the complex.